Coal Hauling Road & Port

Location                     :  Margasari Village, Tapin Regency, South Kalimantan

Client                         :  PT Tapin Coal Terminal (TCT)

 

Description                 :

 

Hauling Road

The 28.66-km long and 15-m wide hauling road is designed and built to withstand the weight of 45 tones coal truck running with a constant speed of 80 km/hour.



Terminal

The terminal is constructed on 55 hectares of land along Barito River. TCT incorporates highly-engineered conveyor and full-automatic integrated system, in addition to its range of main facilities of bridge hopper, well-managed stockpile, underground hopper, fast-moving conveyor belt and radial conveyor loader. Combined with our capable and experienced team on the site, TCT aims to handle coal in the most efficient and effective method.   



Stockpile Capacity

Phase A stockpile has a capacity of 280,000 MT of coal at any given time. Upon completion of Phase B stockpile, the terminal will have a capacity of 600,000 MT available. The terminal system will also enable customers to homogenously blend coals from up to 4 different stockpiles.  



Loading Capacity

TCT has the outstanding capability to load 120,000 MT per day which equivalent to 12 barges a day. Supported with 2 (two) loading conveyors with a speed of 3,000 MT/hour, our customers and partners has benefited from geting dispatch from Mother Vessels and lower rate from the barging services. The 11-m river draft enables the terminal to perform 24-hour loading activities to various barge sizes. Equipped with radial conveyor loader and hi-speed conveyor system, TCT can fully load 300-feet-barge effectively within 3 hours. Phase A has a loading capacity of 25,200,000 MT per annum, which will be utilized by coal mines in Tapin area. Upon the completion of Phase B, the terminal will have a loading capacity of 54,000,000 MT per annum.