Masjid At-Taqwa Garuda

Location            : Cengkareng, Tanggerang Banten

Client                : PT Garuda Indonesia (persero) Tbk.

 

Description      :

 

Construction of Main Building and Renovation of At-Taqwa Mosque PT. Garuda Indonesia (Persero) conducted by PT. Garuda Indonesia (Persero) to move the old offices in the area of  Merdeka Selatan of Jakarta and garuda employees office moved into the area of Soekarno-Hatta airport and meet the needs of the congregation to carry out worship in because of the present condition of less capacity. Office buildings and Madjid At-Taqwa must have a large capacity to meet the large number of pilgrims from year to year the number of pilgrims increases, so it is designed to meet those needs:

a) Can accommodate the number of pilgrims with a total that can be accommodated by 1500 people of the congregation
b) Participate into a building that Go Green because the building of this mosque using the concept of Openness where does not use the wall so it does not require air conditioning as air           conditioning, but using natural air conditioning.
c) Using the concept of open so that the use of lights also make energy efficient because during the day all the lights on power off, so participate in energy savings.
d) Can be used as a means of education because there are classrooms and libraries.
e) Under normal conditions the bias is used as a means to worship the five times prayer because the mosque caretaker is fulfilled.

The renovation of the At-Taqwa Mosque began 6 months (January 2010 - May 2010) and experienced three months (August, 31st 2010)